|
|
| The eProcurement System enables the Tenderers to download the Tender Schedule free of cost and then submit the bids online through this portal. |
|
| |
|
|
| |
| 1. Shree Singaji Thermal Power Project, Khandwa- Construction of 01 nos. semi covered shed for permanent store Phase-II at SSTPP, Dongalia Distt. Khandwa. |
WT-2878 |
29-Jan-2026 03:30 PM |
05-Feb-2026 03:30 PM |
| 2. purchase sanitation item |
2516/nirwah/25date26.12.2025 |
30-Jan-2026 05:30 PM |
02-Feb-2026 11:30 AM |
| 3. Construction Of Chabutra Work At Near Shankar Mandir, Ward No 04, Patan |
1065/PWD/NP/2025 |
19-Jan-2026 05:30 PM |
21-Jan-2026 11:00 AM |
| 4. purchase grain |
2516/nirwah/25date26.12.2025 |
30-Jan-2026 09:00 AM |
02-Feb-2026 11:30 AM |
| 5. T-810/MPPHSCL/ Various Equipment for Maternal health /QC/2026 DATED-02-01-2026 |
T-810/MPPHSCL/ Various Equipment for Maternal health /QC/2026 DATED-02-01-2026 |
29-Jan-2026 03:00 PM |
30-Jan-2026 05:00 PM |
| 6. Implementation (Supply, Installation, Integration Operation and Maintenance) of Hybrid ETC System at Various Toll Plazas of MPRDC in the State of MP Package B |
690 |
03-Feb-2026 03:30 PM |
04-Feb-2026 03:30 PM |
| 7. Dismantling of Existing Shade and fabrication and Erection of fully covered shed for Electrical Site Store of CHP 4 STPS Sarni. |
WT-5041 |
22-Jan-2026 03:00 PM |
27-Jan-2026 05:30 PM |
| 8. T-812/MPPHSCL/HIGH END USG (3D/4D) MACHINE/QC/2026 Dated-02-01-2026 |
T-812/MPPHSCL/HIGH END USG (3D/4D) MACHINE/QC/2026 |
02-Feb-2026 03:00 PM |
03-Feb-2026 03:30 PM |
| 9. Procurement of Various rubber items for different auxiliaries installed at PH I and II, SGTPS, MPPGCL, Birsinghpur. |
465112 |
27-Jan-2026 03:00 PM |
30-Jan-2026 03:30 PM |
| 10. Implementation (Supply, Installation, Integration Operation and Maintenance) of Hybrid ETC System at Various Toll Plazas of MPRDC in the State of MP Package A |
690 |
03-Feb-2026 03:30 PM |
04-Feb-2026 03:30 PM |
|
|
|
| |
 |
|
|
|
| |
|
|
|
|
|
| Search with ID/Title/Reference no |
|
|
|