1. |
14-Mar-2024 05:30 PM |
26-Apr-2024 12:30 PM |
30-Apr-2024 03:30 PM |
[Procurement of 400 kV, 2000 A, three phase (separate R,Y,B Phase) Pantograph Isolator with earth switch complete with structure and support insulators]
[TR-24/2024][2024_MPPTC_345418_1]
|
MP Power Transmission Co. Ltd.||MPPTCL.CE(Procurement)
|
2. |
29-Feb-2024 06:30 PM |
26-Apr-2024 12:30 PM |
29-Apr-2024 03:30 PM |
[Procurement of 220kV Solid Core Insulators]
[TR-13/2024][2024_MPPTC_339680_1]
|
MP Power Transmission Co. Ltd.||MPPTCL.CE(Procurement)
|
3. |
15-Mar-2024 06:00 PM |
26-Apr-2024 03:00 PM |
29-Apr-2024 03:30 PM |
[Procurement of water mist/ fog cannon dust suppression system for track Hopper of CHP-210 MW ATPS MPPGCL Chachai.]
[2617][2024_MPPGC_345076_1]
|
Madhya Pradesh Power Generating Company Limited||Chief Engineer(Gen.)-Amarkantak Thermal Power Station-Chachai - MPPGCL
|
4. |
14-Mar-2024 03:00 PM |
26-Apr-2024 03:00 PM |
30-Apr-2024 03:00 PM |
[Hiring of vehicle]
[ED(HRA)/Veh/221/919][2024_MPPGC_337769_2]
|
Madhya Pradesh Power Generating Company Limited||HQ Jabalpur - MPPGCL||Executive Director(HR and A)-Jabalpur - MPPGCL
|
5. |
12-Mar-2024 02:00 PM |
26-Apr-2024 03:00 PM |
30-Apr-2024 04:00 PM |
[Work of Machining of Inlet Flange USealing Ring of 250 MW KWU IP Turbine of Unit No. 10 11 of PHIV, STPS, MPPGCL, Sarni for AOH of Unit No. 10]
[WT4570][2024_MPPGC_342405_1]
|
Madhya Pradesh Power Generating Company Limited||Chief Engineer(Gen.)-Satpura Thermal Power Station-Sarni - MPPGCL
|
6. |
14-Mar-2024 06:55 PM |
26-Apr-2024 03:00 PM |
29-Apr-2024 03:30 PM |
[Procurement of Scale inhibitor, Organo Phospho-nate-HEDP based formulation for cooling water treatment system 210 MW ATPS MPPGCL Chachai.]
[164][2024_MPPGC_345098_1]
|
Madhya Pradesh Power Generating Company Limited||Chief Engineer(Gen.)-Amarkantak Thermal Power Station-Chachai - MPPGCL
|
7. |
15-Mar-2024 05:30 PM |
26-Apr-2024 03:00 PM |
30-Apr-2024 04:00 PM |
[Hiring of one number Water Mist Fog Machine Water Mist Sprayer Fogger for Ash Silo of PH-IV, STPS, MPPGCL, Sarni along with O N M services]
[WT4580][2024_MPPGC_345892_1]
|
Madhya Pradesh Power Generating Company Limited||Chief Engineer(Gen.)-Satpura Thermal Power Station-Sarni - MPPGCL
|
8. |
15-Mar-2024 06:55 PM |
26-Apr-2024 03:00 PM |
30-Apr-2024 03:30 PM |
[Complete repairing/ replacement and testing of 630 kVA defective transformer at new ash dam of 500MW unit, at SGTPS, MPPGCL, Birsinghpur.]
[322758][2023_MPPGC_322758_2]
|
Madhya Pradesh Power Generating Company Limited||Chief Engineer(Gen.)-Sanjay Gandhi Thermal Power Station-Birsinghpur - MPPGCL
|
9. |
26-Feb-2024 06:55 PM |
26-Apr-2024 03:00 PM |
30-Apr-2024 03:30 PM |
[Work contract for Availing Expert Supervisory services for the overhauling of FD fans type FAF 17/9.5 1 installed at the boiler of 1x210 MW unit, ATPS, MPPGCL, Chachai]
[2253][2024_MPPGC_331455_1]
|
Madhya Pradesh Power Generating Company Limited||Chief Engineer(Gen.)-Amarkantak Thermal Power Station-Chachai - MPPGCL
|
10. |
29-Feb-2024 05:00 PM |
26-Apr-2024 03:00 PM |
29-Apr-2024 03:30 PM |
[Supply of M.S. Angles, M.S.Channels,M.S. Flats, M.S.Beam,M.S. Round Bar, M.S.Square to our various Power Stations of MPPGCL ]
[CE(MM)/STEEL/24][2024_MPPGC_336494_1]
|
Madhya Pradesh Power Generating Company Limited||HQ Jabalpur - MPPGCL||Executive Director(MM)-Jabalpur - MPPGCL
|