1. |
25-Jan-2024 02:00 PM |
28-Mar-2024 03:30 PM |
03-Apr-2024 03:30 PM |
[Construction of playground for hockey in the residential complex of SSTPP, MPPGCL, Dongalia, Khandwa.]
[WT-2052][2023_MPPGC_297248_1]
|
Madhya Pradesh Power Generating Company Limited||Executive Director(Gen.)-Shri Singaji Thermal Power Station-Khandwa - MPPGCL
|
2. |
01-Mar-2024 05:20 PM |
28-Mar-2024 03:30 PM |
02-Apr-2024 03:30 PM |
[Work contract for painting of HT and LT transformers and all BUS Duct of Generator, Generator Transformers, Unit auxiliary transformer, Station transformers etc. of Unit-1,Ph-1, SSTPP, MPPGCL, Dongalia]
[WT-2187][2023_MPPGC_319448_2]
|
Madhya Pradesh Power Generating Company Limited||Executive Director(Gen.)-Shri Singaji Thermal Power Station-Khandwa - MPPGCL
|
3. |
11-Mar-2024 06:00 PM |
28-Mar-2024 03:30 PM |
02-Apr-2024 03:30 PM |
[Hiring of one number Air conditioned compact sedan car/SUV with engine capacity upto about 1200cc (for Petrol /diesel version) for Addl CE (OandM)-I, SSTPP, MPPGCL, Dongalia on monthly run basis for 2500 km per month for a period of 24 Months]
[WT-2270][2024_MPPGC_336894_1]
|
Madhya Pradesh Power Generating Company Limited||Executive Director(Gen.)-Shri Singaji Thermal Power Station-Khandwa - MPPGCL
|
4. |
15-Feb-2024 06:00 PM |
28-Mar-2024 03:30 PM |
02-Apr-2024 03:30 PM |
[Procurement of three phase solid state relay for ESP of 2X660MW, SSTPP, MPPGCL, Dongalia]
[PT-2404][2023_MPPGC_322429_1]
|
Madhya Pradesh Power Generating Company Limited||Executive Director(Gen.)-Shri Singaji Thermal Power Station-Khandwa - MPPGCL
|
5. |
07-Feb-2024 06:55 PM |
28-Mar-2024 03:30 PM |
03-Apr-2024 03:30 PM |
[Work of chain link mesh fencing with steel gate around the raw water reservoir of Stage-I and II at SSTPP, Dongalia Distt. Khandwa.]
[WT-2158][2023_MPPGC_317544_1]
|
Madhya Pradesh Power Generating Company Limited||Executive Director(Gen.)-Shri Singaji Thermal Power Station-Khandwa - MPPGCL
|
6. |
12-Mar-2024 01:30 PM |
28-Mar-2024 03:30 PM |
02-Apr-2024 03:30 PM |
[Work Contracrt for reclamation of damaged and worn out coal burner assembly and rear body of L and T MHI make installed in boiler of 2x660MW, SSTPP,MPPGCL, Dongalia,.]
[WT-2287][2024_MPPGC_342347_1]
|
Madhya Pradesh Power Generating Company Limited||Executive Director(Gen.)-Shri Singaji Thermal Power Station-Khandwa - MPPGCL
|
7. |
29-Feb-2024 06:55 PM |
28-Mar-2024 03:30 PM |
02-Apr-2024 03:30 PM |
[Work contract for Preventive/Breakdown maintenance of Boiler Pressure Parts of 2x600 MW, Unit- 1and 2, Stage-I, SSTPP, MPPGCL, Dongalia.]
[WT-2097][2023_MPPGC_305566_2]
|
Madhya Pradesh Power Generating Company Limited||Executive Director(Gen.)-Shri Singaji Thermal Power Station-Khandwa - MPPGCL
|
8. |
08-Mar-2024 02:00 PM |
28-Mar-2024 03:30 PM |
02-Apr-2024 03:30 PM |
[Work contract for Anti-corrosive, Anti-Erosion, Anti-Abrasive Polymeric Epoxy Coating on surface of condenser water box installed in Unit-1 at 2X600 MW, SSTPP, MPPGCL, Dongalia]
[WT-2192][2023_MPPGC_318546_2]
|
Madhya Pradesh Power Generating Company Limited||Executive Director(Gen.)-Shri Singaji Thermal Power Station-Khandwa - MPPGCL
|
9. |
27-Feb-2024 01:00 PM |
28-Mar-2024 03:30 PM |
03-Apr-2024 03:30 PM |
[Procurement of flexible copper cable for hoist and crane installed at 2x660MW, SSTPP, MPPGCL, Khandwa]
[PT-2686][2024_MPPGC_327094_1]
|
Madhya Pradesh Power Generating Company Limited||Executive Director(Gen.)-Shri Singaji Thermal Power Station-Khandwa - MPPGCL
|
10. |
06-Mar-2024 12:00 PM |
28-Mar-2024 03:30 PM |
02-Apr-2024 03:30 PM |
[Procurement of PVC Pipes (Size 250NB), PVC Elbow, Coupler and End Cap for TMD OS-I at 2x600MW, SSTPP, MPPGCL, Khandwa ]
[PT-2667][2024_MPPGC_331307_1]
|
Madhya Pradesh Power Generating Company Limited||Executive Director(Gen.)-Shri Singaji Thermal Power Station-Khandwa - MPPGCL
|